Description
DIMES8 is the capacity-oriented linear planning and control alternative to conventional process-oriented methods. It delivers times as planning outputs and does not require them as input variables. DIMES8 integrates all aspects of the construction process, such as construction time, labor, execution capacities, effectiveness, and costs. During the construction process, DIMES8 generates not only graphical and numerical, daily updated target-actual comparisons from recorded completion levels (f), but also automatic plan updates based on the complementary values W*(1-f).
Problem solving
Process-oriented methods of construction site management fail due to a multitude of inherent procedural problems because they are based on the following premises:
– Newton's Absoluteness of space and time
-The determination of the dependent Quantities Space and Time (states)
– The inevitable result of the indispensable determination of the actual capacities on the construction site Over-regulations, which in Contradictions lead.
Process-oriented construction scheduling operates analogously to the relationship v = s/t, which is only valid for mass points, without considering that both the location of a process and the executing capacity itself have a spatiotemporal extent. Therefore, there can be neither a sharply defined beginning nor a sharply defined end, which also makes the duration an interpretable quantity.